• <pre id="cvnix"><tt id="cvnix"></tt></pre>

              <address id="cvnix"></address>
              <pre id="cvnix"><del id="cvnix"></del></pre>
            1. <sup id="cvnix"></sup>
                <object id="cvnix"></object>
                  • 1
                  • 2

                  EPC

                  EPC
                  • 產(chǎn)品介紹

                  1523063505511091393.jpg  1523063505565026153.jpg 1523063505683029427.jpg

                  規(guī)格 (Type)
                  尺寸(Dimensions)  (Unit : mm)
                  圖形
                        Fig
                  Ae
                  A
                  B
                  C1
                  C2
                  C3
                  D1
                  D2
                  E
                  F
                  (mm2)
                  EPC13/13A
                  13.20±0.40
                  13.20±0.40
                  4.60±0.15
                  2.05±0.10
                  ----
                  10.80±0.30
                  8.30min
                  5.60±0.15
                  9.00±0.40
                  Fig.3
                  12.5 
                  EPC13/13.5A
                  13.20±0.40
                  13.50±0.30
                  4.60±0.15
                  2.05±0.10
                  ----
                  10.80±0.30
                  8.30min
                  5.60±0.15
                  9.30±0.30
                  Fig.3
                  12.5 
                  EPC13/13C
                  13.20±0.40
                  13.20±0.40
                  6.50±0.15
                  3.55±0.10
                  ----
                  10.80±0.30
                  8.30min
                  5.60±0.15
                  9.00±0.40
                  Fig.5
                  19.2 
                  EPC13/13.4C
                  13.20±0.40
                  13.40±0.40
                  6.50±0.15
                  3.55±0.10
                  ----
                  10.80±0.30
                  8.30min
                  5.60±0.15
                  9.15+0.40-0.30
                  Fig.5
                  19.2 
                  EPC13.5/13.2
                  13.50±0.30
                  13.20±0.40
                  4.60±0.15
                  2.05±0.10
                  ----
                  10.80min
                  8.50min
                  5.60±0.15
                  9.00±0.40
                  Fig.3
                  12.7 
                  EPC13.5/13.2A
                  13.45±0.40
                  13.20±0.30
                  6.50±0.15
                  3.55±0.10
                  5.00±0.15
                  10.85min
                  8.55min
                  5.60±0.15
                  9.00±0.30
                  Fig.5
                  19.1 
                  EPC17/9.6C
                  17.50±0.30
                  9.60±0.30
                  6.50±0.15
                  3.10±0.15
                  ----
                  14.80±0.30
                  11.50±0.30
                  7.90±0.15
                  6.10±0.30
                  Fig.6
                  23.3 
                  EPC17/11.1
                  17.60±0.40
                  11.10±0.40
                  6.00±0.20
                  2.80±0.20
                  ----
                  14.30min
                  11.50min
                  7.70±0.15
                  6.10±0.30
                  Fig.3
                  23.0 
                  EPC17/15.5
                  17.60±0.30
                  15.50±0.30
                  6.00±0.20
                  2.80+0.10-0.20
                  ----
                  14.30min
                  11.50min
                  7.70±0.20
                  10.50±0.30
                  Fig.3
                  22.6 
                  EPC17/16.2
                  17.60±0.40
                  16.20±0.40
                  6.00±0.20
                  2.80+0.10-0.20
                  ----
                  14.30min
                  11.50min
                  7.70±0.20
                  11.20±0.40
                  Fig.3
                  22.6 
                  EPC17/16.8B
                  17.50±0.30
                  16.80±0.30
                  6.00±0.15
                  2.80±0.10
                  ----
                  14.60min
                  11.90min
                  7.70±0.15
                  11.80±0.30
                  Fig.3
                  22.1 
                  EPC17/17
                  17.50±0.30
                  17.10±0.40
                  6.00±0.15
                  2.80±0.10
                  ----
                  14.30min
                  11.50min
                  7.70±0.15
                  12.10±0.40
                  Fig.3
                  22.8 
                  EPC17/17.3
                  17.50±0.30
                  17.30±0.30
                  6.00±0.15
                  2.80±0.10
                  ----
                  14.30min
                  11.50min
                  7.70±0.15
                  12.30±0.30
                  Fig.3
                  22.8 
                  EPC17/17.5
                  17.60±0.40
                  17.50±0.40
                  6.00±0.15
                  2.80±0.10
                  ----
                  14.30min
                  12.00±0.50
                  7.70±0.15
                  12.50±0.40
                  Fig.3
                  22.8 
                  EPC17/17.5B
                  17.50±0.30
                  17.50±0.30
                  6.00±0.15
                  2.80±0.10
                  ----
                  14.60min
                  11.90min
                  7.70±0.15
                  12.50±0.30
                  Fig.3
                  22.1 
                  EPC17/17.1B
                  17.50±0.30
                  17.10±0.30
                  6.00±0.15
                  2.80±0.10
                  ----
                  14.60min
                  11.90min
                  7.70±0.15
                  12.10±0.30
                  Fig.3
                  22.1 
                  EPC17/17.3B
                  17.50±0.30
                  17.30±0.30
                  6.00±0.15
                  2.80±0.10
                  ----
                  14.60min
                  11.90min
                  7.70±0.15
                  12.30±0.30
                  Fig.3
                  22.1 
                  EPC17/17B-1
                  17.50±0.30
                  17.00±0.20
                  6.00±0.15
                  2.80±0.10
                  ----
                  14.50min
                  12.00min
                  7.70±0.15
                  12.00±0.30
                  Fig.3
                  22.1 
                  EPC19/19
                  19.10±0.40
                  19.50±0.40
                  6.00±0.20
                  2.50±0.20
                  ----
                  15.80min
                  13.10min
                  8.50±0.20
                  14.50±0.40
                  Fig.3
                  22.7 
                  EPC19/19.9
                  19.10±0.40
                  19.90±0.40
                  6.00±0.20
                  2.50±0.20
                  ----
                  15.80min
                  13.10min
                  8.50±0.20
                  14.90±0.40
                  Fig.3
                  22.7 
                  EPC27/31.1A
                  27.00±0.50
                  31.10±0.30
                  8.00±0.20
                  6.50±0.15
                  3.90±0.15
                  22.60±.0.50
                  19.20±0.50
                  13.00±0.25
                  24.10±0.30
                  Fig.3
                  46.1 
                  EPC34.4/37.4
                  34.40±0.50
                  37.40±0.30
                  8.90±0.20
                  5.35±0.15
                  ----
                  25.90min
                  24.40min
                  14.00+0.15-0.25
                  28.00±0.30
                  Fig.4
                  74.4 
                  EPC36.5/21.6
                  36.50±0.50 
                  21.60±0.30
                  10.00±0.20
                  4.00±0.20 
                  ----
                  29.30±0.40
                  25.00±0.40
                  23.00±0.30
                  11.70±0.30
                  Fig.1
                  91.9 
                  EPC38.4/37.4
                  38.40±0.60
                  37.40±0.30
                  8.90±0.20
                  5.35±0.15
                  ----
                  29.70min
                  28.60min
                  14.00+0.15-0.25
                  28.00±0.30
                  Fig.4
                  75.1 
                  EPC38.9/31.4
                  38.90+0.40-0.60 
                  31.40±0.40 
                  9.85±0.15 
                  4.00±0.15 
                  7.42±0.20 
                  31.36±0.50
                  26.45±0.40
                   
                  25.36±0.40
                  18.40±0.40
                  Fig.1
                  93.3 
                  EPC38.9/31.6
                  38.90+0.40-0.60 
                  31.60±0.50 
                  9.85±0.15 
                  4.00±0.15 
                  7.42±0.20 
                  31.36±0.50
                  26.45±0.40
                   
                  25.36±0.40
                  18.60±0.40
                  Fig.1
                  93.3 
                  EPC41.5/37
                  41.50±0.60 
                  37.00±0.30
                  11.25±0.20
                  7.50±0.20 
                  5.50+0.00/-0.30
                  32.50+1.20/-0.00
                  ----
                  20.50+0.00/-0.60
                  27.30±0.30
                  Fig.7
                  90.9 
                  EPC50.5/51.2
                  50.50±0.80
                  51.20±0.40
                  9.00±0.30
                  5.00±0.20
                  ----
                  38.00±0.60
                  ----
                  23.5±0.40 
                  37.00±0.40
                  Fig.2
                  116 
                  EPC53/41.4
                  53.00±0.80
                  41.40±0.40
                  12.15±0.20
                  7.15±0.15
                  5.80±0.15
                  41.20±0.80
                  38.00±0.80
                  28.60±0.45
                  29.00±0.40
                  Fig.7
                  153 

                   

                  上一頁(yè)
                  下一頁(yè)
                1. <pre id="cvnix"><tt id="cvnix"></tt></pre>

                            <address id="cvnix"></address>
                            <pre id="cvnix"><del id="cvnix"></del></pre>
                          1. <sup id="cvnix"></sup>
                              <object id="cvnix"></object>
                              1. 蜜乳av网站 | 黄网站免费看 | 欧美人乱人精品A片 | 北条麻妃九九精品视频 | 香蕉精品在线视频 |